Saturday, 23 April 2011

Its Holiday time for everyone but us!

We have been really looking forward to the bank holiday break and Easter weekend as we have five days off in a row.  To us this means a concentrated push on the house which we are very keen to try and get finished by the summer. So Good Fridays jobs were to, sort out all the electrics and sockets,  build a wall up in the alcove where the bed will sit in front of it and plasterboard one of the other walls all ready for plastering on Sunday.  It was a busy day and we had Jordan and his new girlfriend Zoe up for the weekend.  We did manage to have a break for coffee, a BBQ lunch and a surf and hot tub before summer.



Alcove built in were bed will go in front and will form a shelf

Wall plaster boarded and sockets in

The photos show the alcove plaster boarded and the wall plaster boarded all ready for plastering on Saturday and also the surf that they had in the afternoon. 
Zoe, Jordan and G back from a surf